Skip to content
Home » 1987-1991 Dodge Dakota 3.9L V6 Shorty Header Installation Instructions

1987-1991 Dodge Dakota 3.9L V6 Shorty Header Installation Instructions

January 3rd, 2010 · No Comments

These components are designed to improve the exhaust efficiency of the Dodge 3.9 Litre V6 engine with E.F.I. (Electronic Fuel Injection). These tubular manifolds are a direct replacement for the factory exhaust manifolds. A performance gain can be expected by the installation of this system. This system does not require welding for installation and retains all O.E.M. emissions equipment.

This Edelbrock part has received an Executive Order (E.O. #) from the California Air Resources Board (C.A.R.B.) making it legal for street use on pollution-controlled motor vehicles in all 50 states. To assist you with emissions equipment certification, we have included a silver fan shroud decal to help testing personnel verify that this part is a legal replacement part on the vehicle for which it is cataloged. The adhesive-backed decal should be affixed to your fan shroud next to the existing emission and engine specification decal. Do not cover your original equipment specification decal with the Edelbrock fan shroud decal.

• DISASSEMBLY
1. Disconnect negative cable from battery.
2. Use penetrating oil on all nuts and bolts to be removed. This will prevent the possibility of broken or stripped nuts and bolts.
3. Remove O2 sensor (1987 only) being careful not to rupture or destroy the unit. WARNING: Do not clean this unit in any solvent and do not damage wire.
4. Unbolt air injection tubes from both manifolds.
5. Unbolt exhaust pipes from both exhaust manifolds.
6. Unbolt and remove both exhaust manifolds.
7. Install 5/16″x 1-1/8″ studs (supplied) in second hole on left side and third hole on right side (where OEM bolts were located on exhaust manifolds).
8. Clean and inspect all sealing surfaces before assembly.

• ASSEMBLY – LEFT SIDE
1. Place manifold port gasket over studs (be sure surface is clean).
2. Install TES manifold over studs, install OEM cup washers, nuts and additional nut provided in kit, then tighten evenly.
3. Bolt air injection tube to manifold using OEM gasket (do not tighten at this time).
4. Bolt exhaust pipe to TES manifold using 3/8″ x 2″ bolts, nuts, and lock washers provided in kit (do not tighten at this time).
5. Install O2 sensor using anti-seize on threads and torque to 30 ft./lbs.
• ASSEMBLY – RIGHT SIDE
1. Place heat stove plate on top of TES manifold, insert 1-3/4″ long round head screw through plate and down between front primary tubes adjacent to port flange. Place 3/16″ flat washer and lock washer over screw, then start nut (do not tighten at this time).
2. Place band clamp over rear primary tube at the front and attach to heat stove using 3/16″ bolt, lock washer, and nut provided in kit. Secure heat stove plate at this time.
3. Rubber mud guard attached to fender well must be trimmed to clear TES manifold tubes.
4. Remove the manifold and trim the necessary material from the mud guard.
5. Place manifold port gasket over studs (be sure surface is clean).
6. Install TES manifold over studs; install OEM cup washers, nuts, and additional nut provided in kit, then tighten evenly.
7. Bolt air injection tube to manifold using OEM gasket and tighten both sides at this time.
8. Bolt exhaust pipe to manifold using 3/8″ x 2″ bolts, nuts, and lock washers provided in kit.
9. Tighten both right and left side exhaust pipe connections.
10. Connect negative cable to battery.
11. Be sure that all brake and fuel lines have adequate clearance.
12 Start engine and bring up to normal running temperature, then turn off and let cool.
13. When cool, re-tighten all manifold nuts and bolts.

Download

Related Post

  • 1999-2000 Dodge Durango 318 0r 360 C.I. Engine Powerdyne Supercharger kit Installation
  • 1997-2002 Ford F-150/Expedition 4.6L- 5.4L engine Powerdyne Supercharger kit Instructions
  • 1997-2002 Ford F-150/Expedition Powerdyne Supercharger kit Installation Instructions
  • 94-01 Dodge Ram 3.9L, 5.2L PowerAid Throttle Body Spacer Installation Instructions
  • 05-09 Nissan Frontier/Xterra/Pathfinder 4.0L V6 PowerAid Throttle Body Spacer Instructions
  • 2000 Dodge Truck Dakota 2WD V8-5.9L VIN Z LDC Radiator Service and Repair
  • 92-97 5.0L Ford EB-EL Falcon BPT A S P523500A S P Instructions
  • 2001 Ford F150 Crew Cab Installation Instructions
  • Mazda 323 1.6i GLX Fastback
  • 2002 Dodge Ram 1500 Pickup Dynomax Dual Kit Installation Instructions

Related Tags: air injection, air resources board, battery 2, california air resources, california air resources board, cup washers, decal, dodge dakota, electronic fuel injection, exhaust manifolds, exhaust pipes, fan shroud, fuel injection, header installation, negative cable, nuts and bolts, penetrating oil, performance gain, second hole, third hole

Search engine terms: , how to install a choke cable in a 1987 dodge dakota?, 2005 dakota 3/4 TON, how to change 1999 dodge dakota radio, Valae Covers For 1991 Dodge dakota, 1987 dodge dakota engine picture, 91 dodge rear tail light wiring color, , dodge dakota starter, , fuel pump wiring diagram dodge truck 1991, , dodge dakota 2002 3 9 engine illustration, vacuum diagram 90 dakota, dodge dakota 2003 v6 scamatrics, aire valve parst3 9litre doge 2003, , aire valve 3 9litre doge 2003, exhaust diagram dodge dakota, 2002 dakota 3 9L complete exhaust system,

Leave a Reply

Your email address will not be published. Required fields are marked *